IDF M113 Chata P (Late)

2017 Recovery & Engineering Vehicles Group Build. Campaign runs from 01/07/17 - to 31/12/17. Campaign medals awarded for models completed within those dates.
Adam Durrant
Senior Site Contributor.....
Senior Site Contributor.....
Posts: 1791
Joined: 22 Apr 2016, 05:41
Location: Auckland, NZ

Re: IDF M113 Chata P (Late)

Post by Adam Durrant »

This was a bit of an experiment. I usually have a wee photo tent thing to diffuse the light but was too lazy to set it all up ;)
I'm a serial kit starter....
Completed Campaigns:
ImageImageImageImageImageImageImageImageImageImageImageImageImageImageImageImageImageImageImageImage

Post Reply